Builder Cabinet Packages in Norcross, GA
Builder cabinet packages in Norcross and Gwinnett County follow the draw schedule and deliver to the job site, not to a warehouse holding account.
Free estimate from a local cabinet pro. No obligation.
Get my free estimate
Or call (678) 498-7454. Calls only, we do not receive text messages.
Answered 24/7
Running a production build in Norcross means juggling multiple lots with overlapping schedules. You need builder cabinet packages in Norcross, GA that arrive per lot on a specific date, not all at once at the end of the subdivision. Agree release and delivery dates against the construction milestones, including what happens if an inspection or material delivery is delayed.
- Free estimate from a local pro
- No obligation to go ahead
- Semi-custom to full custom

About our new construction builder cabinet packages
The countertop template is booked from the cabinet install date, which means the cabinet delivery sets two trades on your schedule. Each lot release names the plan, elevation and selected color so nothing is re-drawn between lots. Call to build your per-plan box list and set the release calendar for your current build.
Builder cabinet packages in Norcross
Gwinnett new-build cabinets that land when framing is done
Gwinnett County new-construction timelines are driven by draw schedules. Cabinets delivered to a job site before the walls are painted sit in a finished space through the worst part of the project. Cabinets that arrive late delay the countertop template, the plumber's final trim, and the certificate of occupancy. The delivery date is a schedule decision, not a logistics afterthought.
- Cabinets stored on a Gwinnett site through the flooring and painting phase pick up dust and moisture.
- The countertop fabricator needs set cabinets to cut the template. A late delivery holds the whole finish schedule.
- So you can name one delivery date to the GC and build the rest of the schedule around it.
Free estimate from a local cabinet pro. No obligation.
Answered 24/7
Gwinnett County new construction cabinets
Builder pricing that separates the box from the install
A builder comparing cabinet bids needs cabinet cost and install cost on different lines. When the install scope changes because a subcontractor stepped in, the GC needs to defend one number and renegotiate the other. A bundled quote makes that impossible and becomes a source of change-order disputes that no one planned for.
- Cabinet cost is the material decision. Install cost is the labor decision. They are not the same line.
- If the install subcontractor changes mid-project, a bundled quote hides which cost moved.
- So you can hand the developer a cabinet line item that stands on its own when the install price gets renegotiated.
Free estimate from a local cabinet pro. No obligation.
Answered 24/7
Norcross builder cabinet quote
A builder cabinet quote Gwinnett GCs can show the owner
A builder presenting a cabinet line item to a new-construction buyer or a developer needs a quote that names every box, every door, and every finish with a unit count. A vague number opens the conversation to second-guessing. A line-item quote closes it. Ask for the free estimate on the floor plan before the budget is set.
- Owners ask where the cabinet number came from. A line-item quote answers that question.
- So you can swap one door profile for another and see exactly what the change costs.
- A quote without unit counts is not a quote. It is a ballpark that will move.
Free estimate from a local cabinet pro. No obligation.
Answered 24/7
Why Norcross Cabinet Supply
How to plan your project
Tell us about the room and a local cabinet pro gives you a free estimate, with no obligation to go ahead.
Free estimate from a local cabinet pro. No obligation.
Answered 24/7
Release per lot against the drywall date
The core of the builder package is the release schedule. Rather than shipping a full subdivision order on a single date, cabinets are released per lot against the drywall inspection date for that specific lot. When the builder confirms a lot has passed drywall inspection, the cabinet delivery is scheduled for that lot only. Boxes arrive when the room is ready to receive them.
The install crew arrives the day after delivery or the following morning, depending on the lot schedule. Because the delivery date is tied to a hard inspection milestone rather than a vague calendar week, the superintendent has a fixed date to plan around. The countertop template is booked from this install date, which means the cabinet release sets the schedule for both the cabinet install and the countertop fabrication. No trade is left guessing when the previous trade will finish.
If a lot falls behind on framing or drywall, the release for that lot is delayed without affecting the releases for other lots that are on schedule. This isolation is the primary advantage of per-lot scheduling over a bulk subdivision order.
One approved box list per plan
Each floor plan in a subdivision gets a single approved box list. This list is drawn and signed off once, at the start of the project, and includes every cabinet box by size, type, door style and finish. When a lot is released, the release document names the plan number, the specific elevation and the selected color or finish. The factory builds to this approved list, so the boxes that arrive for lot four are identical to the boxes that arrived for lot one, assuming the same plan and finish are selected.
This approach eliminates the need to re-draw or re-specify cabinets for every lot. The design effort happens once per plan, not once per lot. For a subdivision with five different floor plans, the builder works with five approved box lists, not fifty.
If a plan is revised mid-build, such as adding a pantry to a base plan or changing the door style, the approved box list is updated once and the change applies to all future releases of that plan. Past releases are unaffected.

Buyer upgrades as add-on lines
When a buyer selects an upgrade beyond the base plan package, such as a kitchen island, a full pantry, a garage cabinet package or a laundry room set, that option is priced as an add-on line to the base plan. The base plan package covers the standard kitchen and bathroom cabinets for that floor plan. The add-on is a separate line item on the release document, so the buyer upgrade changes one line of the release without altering the base package structure.
The builder can quote upgrades to buyers and track selections per lot. The release document shows the base plan line and any add-on lines, with the total for that lot. The factory sees the full release, including base and add-ons, and builds accordingly.
Add-on options are priced at the time the base plan is approved, so the builder knows the cost of each upgrade before marketing the lot. The price of an add-on is fixed for the duration of the project, subject to the terms of the written quote.
Delivery and install sequence on site
Cabinet delivery is scheduled for the lot after drywall inspection is complete. The delivery truck brings the boxes for that lot only, not for the entire subdivision. The boxes are unloaded and placed in the designated area of the lot, typically the garage or a protected corner of the kitchen, depending on the lot layout.
Installation begins the following day or the next available install slot. The install crew sets the base cabinets first, shimming them plumb and level on the subfloor. Wall cabinets are hung after the bases are set, and tall units such as pantry or oven cabinets are installed next. Doors and drawers are hung and adjusted after the boxes are set. The install typically runs one to two days for a standard kitchen, depending on the number of boxes and any add-on units.
The countertop template is scheduled for the day after install is complete. The template takes the measurements of the installed cabinets, including any scribe lines, so the countertop fits the actual cabinet footprint rather than the theoretical layout. The countertop fabrication lead time is booked from the template date, which is set by the cabinet install date, which is set by the cabinet delivery date, which is set by the drywall inspection date. The entire sequence is driven by the initial release schedule.

Builder cabinet package cost in Norcross
Builder cabinet packages are priced per plan, with the cost driven by the number of linear feet in the cabinet run, the grade of cabinet, the door style and the box construction. Semi-custom lines, which are the most common for production builds, run roughly $150 to $700 per linear foot installed. Custom lines, used for high-end plans or specific design requirements, run roughly $500 to $1,200 per linear foot. A standard kitchen package for a production build can range from roughly $8,000 to $30,000 per lot, depending on the plan size and finish.
Within any grade, the price is affected by door style, with slab doors costing less than raised panel or inset, and by box construction, with plywood boxes costing more than particleboard but holding fasteners better in Georgia humidity. Drawer count versus door count also moves the price, as a drawer base costs more than a door base of the same width. Add-on units such as islands, pantries or garage packages are priced separately and added to the base plan cost.
Hardware choices, including soft-close hinges and undermount drawer slides, are specified at the plan approval stage. Demolition is not part of the builder package scope because new construction lots do not have existing cabinets to remove. Wall and plumbing changes are handled by the builder or their subcontractors before cabinet install. These are estimates for builder cabinet packages in Norcross, GA, subject to change, and the written quote signed at plan approval sets the final price for each lot release.
The process
From first call to installed cabinets
Four steps, and you make a decision at the end of each one before the next begins.
Call or send the form
Tell us about the room and what you want from it, and a local cabinet pro contacts you to talk it through.
Free estimate
A free estimate for the room, with door style, finish and hardware choices to weigh before you commit.
Decide, then order
Ask for every cabinet and the lead time to be listed in writing. Nothing is ordered until you decide to go ahead.
Delivery and install
Boxes are checked on arrival, set level and scribed to the walls, doors adjusted, then a walk-through with you.
Free estimate from a local cabinet pro. No obligation.
Answered 24/7
Also from us
Related Services
Commercial Cabinets
Wholesale Cabinets for Contractors and Builders
Multifamily and Apartment Cabinet PackagesFree estimate from a local cabinet pro. No obligation.
Answered 24/7
More cabinet options



Service area
Areas covered by these guides
Questions
New Construction Builder Cabinet Packages: Common Questions
How does the release schedule work across multiple lots?
Each lot has its own release date tied to its drywall inspection date. When you confirm a lot has passed drywall, the cabinet delivery is scheduled for that lot. Other lots on the same plan are not affected. You can release lots in any order, and the factory builds to the approved plan list for each release. This means you can stagger deliveries to match your actual construction progress rather than forcing all lots to finish on the same date.
What happens if a lot falls behind on drywall?
The release for that lot is delayed until the drywall inspection is complete. The factory does not build ahead of the release, so there is no inventory sitting in the factory waiting for a lot that is not ready. The delay does not affect the schedule for other lots. You simply confirm the new drywall date, and the release is rescheduled accordingly. This flexibility is the main reason per-lot scheduling works better than bulk orders for production builds.
Can we change the plan mid-build?
Yes, but the change is made to the approved box list for that plan, not to individual lot releases. If you add a pantry to a base plan, the approved list is updated once, and all future releases of that plan include the pantry. Lots that have already been released and installed are not affected. This keeps the design stable while allowing for the changes that are common during a production build.
How are buyer upgrades handled on the release?
Buyer upgrades are added as add-on lines to the base plan release. The base plan covers the standard cabinets for that floor plan, and the add-on line covers the upgrade, such as an island or a garage package. The release document shows both lines, so the factory builds both. The price of the add-on is fixed at the time the base plan is approved, so you know the cost before the buyer selects the upgrade.
What should a builder package quote include?
The estimate covers the approved box list for each plan, the price per plan, and the price of any standard add-ons. It also includes the release process, the delivery and install scope, and the lead time for the cabinet line. The quote is the document that sets the final price for the project. Any changes to the plan or the scope are quoted separately before the order is updated.
Do you cover the Gwinnett County build area?
Norcross Cabinet Supply serves Norcross and the surrounding Gwinnett County area for builder and production projects. The service area is confirmed at the time of the initial meeting. Call to check the current service schedule for your specific subdivision or build site.
Talk to us about new construction builder cabinet packages
Tell us about the room, in Norcross or anywhere in the service area, and a local cabinet pro gives you a free estimate, with no obligation.
Free estimate from a local cabinet pro. No obligation.
Answered 24/7
Calls only, we do not receive text messages.