Builder Cabinet Packages in Norcross, GA
Running a production build in Norcross means juggling multiple lots with overlapping schedules. You need builder cabinet packages in Norcross, GA that arrive per lot on a specific date, not all at once at the end of the subdivision. Ask Norcross Cabinet Supply whether releases can be scheduled against the current drywall and installation dates, and confirm availability before committing to the sequence.
- Itemized written quotes
- Measured before ordering
- Semi-custom to full custom
Request a written quote
Or call (678) 498-7454. Calls only, we do not receive text messages.
About our new construction builder cabinet packages
The countertop template is booked from the cabinet install date, which means the cabinet delivery sets two trades on your schedule. Each lot release names the plan, elevation and selected color so nothing is re-drawn between lots. Call to build your per-plan box list and set the release calendar for your current build.
Why Norcross Cabinet Supply
How We Work
One conversation in your home, one measure, one written quote, then an install date.
Release per lot against the drywall date
The core of the builder package is the release schedule. Rather than shipping a full subdivision order on a single date, cabinets are released per lot against the drywall inspection date for that specific lot. When the builder confirms a lot has passed drywall inspection, the cabinet delivery is triggered for that lot only. Boxes arrive when the room is ready to receive them.
The install crew arrives the day after delivery or the following morning, depending on the lot schedule. Because the delivery date is tied to a hard inspection milestone rather than a vague calendar week, the superintendent has a fixed date to plan around. The countertop template is booked from this install date, which means the cabinet release effectively sets the schedule for both the cabinet install and the countertop fabrication. No trade is left guessing when the previous trade will finish.
If a lot falls behind on framing or drywall, the release for that lot is delayed without affecting the releases for other lots that are on schedule. This isolation is the primary advantage of per-lot scheduling over a bulk subdivision order.
One approved box list per plan
Each floor plan in a subdivision gets a single approved box list. This list is drawn and signed off once, at the start of the project, and includes every cabinet box by size, type, door style and finish. When a lot is released, the release document names the plan number, the specific elevation and the selected color or finish. The factory builds to this approved list, so the boxes that arrive for lot four are identical to the boxes that arrived for lot one, assuming the same plan and finish are selected.
This approach eliminates the need to re-draw or re-specify cabinets for every lot. The design effort happens once per plan, not once per lot. For a subdivision with five different floor plans, the builder works with five approved box lists, not fifty.
If a plan is revised mid-build, such as adding a pantry to a base plan or changing the door style, the approved box list is updated once and the change applies to all future releases of that plan. Past releases are unaffected.

Buyer upgrades as add-on lines
When a buyer selects an upgrade beyond the base plan package, such as a kitchen island, a full pantry, a garage cabinet package or a laundry room set, that option is priced as an add-on line to the base plan. The base plan package covers the standard kitchen and bathroom cabinets for that floor plan. The add-on is a separate line item on the release document, so the buyer upgrade changes one line of the release without altering the base package structure.
This makes it easy for the builder to quote upgrades to buyers and track which upgrades are selected for each lot. The release document shows the base plan line and any add-on lines, with the total for that lot. The factory sees the full release, including base and add-ons, and builds accordingly.
Add-on options are priced at the time the base plan is approved, so the builder knows the cost of each upgrade before marketing the lot. The price of an add-on is fixed for the duration of the project, subject to the terms of the written quote.
Delivery and install sequence on site
Cabinet delivery is scheduled for the lot after drywall inspection is complete. The delivery truck brings the boxes for that lot only, not for the entire subdivision. The boxes are unloaded and placed in the designated area of the lot, typically the garage or a protected corner of the kitchen, depending on the lot layout.
Installation begins the following day or the next available install slot. The install crew sets the base cabinets first, shimming them plumb and level on the subfloor. Wall cabinets are hung after the bases are set, and tall units such as pantry or oven cabinets are installed next. Doors and drawers are hung and adjusted after the boxes are set. For builder Cabinet Packages in Norcross, confirm current product availability and the proposed delivery and installation sequence before committing to dates.
The countertop template is scheduled for the day after install is complete. The template takes the measurements of the installed cabinets, including any scribe lines, so the countertop fits the actual cabinet footprint rather than the theoretical layout. The countertop fabrication lead time is booked from the template date, which is set by the cabinet install date, which is set by the cabinet delivery date, which is set by the drywall inspection date. The entire sequence is driven by the initial release schedule.

Builder cabinet package cost in Norcross
Builder cabinet packages are priced per plan, with the cost driven by the number of linear feet in the cabinet run, the grade of cabinet, the door style and the box construction. Compare the Norcross proposal for builder Cabinet Packages in Norcross by scope: retained components, new boxes, hardware, delivery, removal and any separate trade work should be identified before you judge the total. Ask how the quoted builder Cabinet Packages in Norcross option changes with cabinet construction, drawer count, specialty fittings and site preparation; confirm which materials and work are actually included. Within any grade, the price is affected by door style, with slab doors costing less than raised panel or inset, and by box construction, with plywood boxes costing more than particleboard; the manufacturer's specifications for each option should be reviewed when comparing box construction for a given plan. Drawer count versus door count also moves the price, as a drawer base costs more than a door base of the same width. Add-on units such as islands, pantries or garage packages are priced separately and added to the base plan cost.
Hardware choices, including soft-close hinges and undermount drawer slides, are specified at the plan approval stage. Demolition is not part of the builder package scope because new construction lots do not have existing cabinets to remove. Wall and plumbing changes are handled by the builder or their subcontractors before cabinet install. These are estimates for builder cabinet packages in Norcross, GA, subject to change, and the written quote signed at plan approval sets the final price for each lot release.
The process
From first call to installed cabinets
Four steps, and you make a decision at the end of each one before the next begins.
Call or send the form
We call back, talk through the room and what you want from it, and set a time to visit.
Measure and design
A field measure, then a layout with door style, finish and hardware you can see before you commit.
Written quote and order
An itemized quote with the lead time on it. Cabinets are ordered against the measured drawing once you sign.
Delivery and install
Boxes are checked on arrival, set level and scribed to the walls, doors adjusted, then a walk-through with you.
More of What We Build



Service area
Where We Work
Questions
New Construction Builder Cabinet Packages: Common Questions
How does the release schedule work across multiple lots?
Each lot has its own release date tied to its drywall inspection date. When you confirm a lot has passed drywall, the cabinet delivery is scheduled for that lot. Other lots on the same plan are not affected. You can release lots in any order, and the factory builds to the approved plan list for each release. This means you can stagger deliveries to match your actual construction progress rather than forcing all lots to finish on the same date.
What happens if a lot falls behind on drywall?
The release for that lot is delayed until the drywall inspection is complete. For builder Cabinet Packages in Norcross, ask which items the selected supplier actually has available, which require an order and how availability will be confirmed. The delay does not affect the schedule for other lots. You simply confirm the new drywall date, and the release is rescheduled accordingly. This flexibility is the main reason per-lot scheduling works better than bulk orders for production builds.
Can we change the plan mid-build?
Yes, but the change is made to the approved box list for that plan, not to individual lot releases. If you add a pantry to a base plan, the approved list is updated once, and all future releases of that plan include the pantry. Lots that have already been released and installed are not affected. This keeps the design stable while allowing for the changes that are common during a production build.
How are buyer upgrades handled on the release?
Buyer upgrades are added as add-on lines to the base plan release. The base plan covers the standard cabinets for that floor plan, and the add-on line covers the upgrade, such as an island or a garage package. The release document shows both lines, so the factory builds both. The price of the add-on is fixed at the time the base plan is approved, so you know the cost before the buyer selects the upgrade.
What does a builder package quote itemize?
Ask whether a written warranty applies to builder cabinet packages in Norcross, and request its coverage and exclusions before ordering. It also includes the release process, the delivery and install scope, and the lead time for the cabinet line. The quote is the document that sets the final price for the project. Any changes to the plan or the scope are quoted separately before the order is updated.
Do you cover the Gwinnett County build area?
Confirm who will handle the proposed Norcross work for builder Cabinet Packages in Norcross, which documents or samples can be provided and which responsibilities remain with the homeowner or another contractor. The service area is confirmed at the time of the initial meeting. Call to check the current service schedule for your specific subdivision or build site.
Talk to us about new construction builder cabinet packages
Tell us about the room, in Norcross or anywhere in the service area, and we call back to set up a visit.
Calls only, we do not receive text messages.
